{"id":4190,"date":"2023-12-19T17:22:37","date_gmt":"2023-12-19T16:22:37","guid":{"rendered":"https:\/\/www.cvs-avocats.com\/chu-hospitalier-argenteuil-reconstruction-1\/"},"modified":"2026-01-20T15:59:50","modified_gmt":"2026-01-20T14:59:50","slug":"chu-hospitalier-argenteuil-reconstruction-1","status":"publish","type":"post","link":"https:\/\/www.cvs-avocats.com\/en\/chu-hospitalier-argenteuil-reconstruction-1\/","title":{"rendered":"Cornet Vincent S\u00e9gurel advises the Argenteuil Hospital for its reconstruction"},"content":{"rendered":"\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong><em>The symbolic foundation stone for the new Victor-Dupouy hospital was laid on 13 June. A single 77,000 m2 block will replace the existing wards, at a total investment of \u20ac400 million.<\/em><\/strong><\/p>\n\n\n\n<p>The Ministry of Health had given the go-ahead by the end of 2022 for this project, which had been planned for the hospital since 2008. The aim of these major works is to optimise and modernise the hospital centre. The existing building will be demolished and rebuilt, with the exception of the Madeleine-Br\u00e8s building, constructed in 2013, which will be retained. Dating from 1929, the current facility, with its several separate wards, is no longer suited to modern hospital practice. With a single block, the new hospital centre will simplify care pathways and give patients access to the latest technological innovations.<\/p>\n\n\n\n<p>An initial tranche of 30,000 m2 is scheduled for completion in 2027. The project will be completed with a second tranche of 28,000 m2 scheduled for completion in 2030. A total budget of \u20ac400 million will be devoted to the project, including \u20ac140 million in subsidies under the Val-d&#8217;Oise plan and \u20ac41 million in self-financing.<\/p>\n\n\n\n<p>The project will be managed by Bouygues and the architects Brunet Saunier et Associ\u00e9s. For the construction, 20% of the contracts should be awarded to local SMEs and craftsmen.<\/p>\n\n\n\n<p>The law firm Cornet Vincent S\u00e9gurel worked alongside the Hospital Centre team throughout the negotiated procedure that led to the signing of the public procurement contract with Bouygues.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Counsel:<\/strong><\/h4>\n\n\n\n<p><strong>Argenteuil Hospital lawyers: <\/strong>Cornet Vincent S\u00e9gurel (Pierre-Alexis Ramaut)<\/p>\n\n\n\n<p><strong>Programmatic real estate strategy:<\/strong> A2MO (Julia Zwarycz)<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The symbolic foundation stone for the new Victor-Dupouy hospital was laid on 13 June. A single 77,000 m2 block will replace the existing wards, at a total investment of \u20ac400 million. The Ministry of Health had given the go-ahead by the end of 2022 for this project, which had been planned for the hospital since [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":4188,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-4190","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-communique-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/posts\/4190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/comments?post=4190"}],"version-history":[{"count":0,"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/posts\/4190\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/media\/4188"}],"wp:attachment":[{"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/media?parent=4190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/categories?post=4190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cvs-avocats.com\/en\/wp-json\/wp\/v2\/tags?post=4190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}